Planning Cabling Work Around Occupied Commercial Spaces

Installing or upgrading communications cabling in an occupied building requires coordination with tenants, property managers and IT personnel to minimize disruption. Five things property managers should check: scheduling, building access, service protection, work area protection, and testing and handoff.

A+ Cable Runners, Commercial Property Management Educational Series: Planning Cabling Work Around Occupied Commercial Spaces. Five things property managers should check: work scheduling, building access, service protection, work area protection, and testing and handoff. Plan the installation around the business, not the business around the installation.

This is the fourteenth post in our Commercial Property Management educational series.

Installing or upgrading communications cabling in an occupied building requires coordination with tenants, property managers and IT personnel to minimize disruption to daily operations. Here are five things property managers should check.

1. Work scheduling

Coordinate installation times around tenant business activities.

A medical office, a law firm and a retail store each have different busy hours. Ask the tenant when noise, ladders and ceiling work would get in the way, and build the schedule from there.

2. Building access

Arrange access to work areas, telecom rooms and ceiling spaces.

Cabling work usually touches more than one space: the tenant's suite, the telecom room and the ceiling or pathways between them. Keys, escorts and permission from neighboring tenants are easier to arrange ahead of time than on the morning of the job.

3. Service protection

Identify active connections that must remain operational.

Phones, payment terminals, cameras and the tenant's internet connection may share the same closet and pathways as the new work. Knowing which connections cannot go down, and when, lets the work be planned around them.

4. Work area protection

Plan for dust control, noise and protection of furnishings.

Lifting ceiling tiles and drilling for new outlets in an occupied office can mean dust on desks and noise during calls. Agree up front on how furniture, equipment and walkways will be protected and how the area will be left at the end of each day.

5. Testing and handoff

Coordinate testing, service interruptions and restoration responsibilities.

Decide before work starts who tests the new cabling, who moves the tenant's equipment over to it and who confirms that everything works afterward. Testing also comes in different levels: verification shows a cable is connected correctly, while certification measures it against the performance standard for its category. Our post on cable testing versus certification explains the difference.

Here's what many people don't realize

  • Cabling upgrades can often be completed in phases.
  • Some work may require after-hours scheduling.
  • Installing new cabling does not always require disconnecting existing services.

Questions to ask your contractor

  • Can work be completed during business hours?
  • Will any services be interrupted?
  • Can installation be completed in phases?
  • How will occupied areas be protected?
  • Who coordinates testing and service restoration?

The same habit of coordinating access with tenants runs through our earlier post on how preventive low-voltage inspections can reduce tenant disruptions.

The bottom line

Plan the installation around the business, not the business around the installation.

The next post in the series covers what to check in the low-voltage infrastructure before you sign off on a tenant improvement. To see the cabling work we do, visit our computer network cabling page.

Educational information only. Cabling requirements and performance depend on the installation, equipment, applicable standards and intended application. This is not a substitute for project-specific design or engineering. Always follow applicable codes and manufacturer instructions, and verify project requirements individually.

Common questions

Can cabling work be done while a tenant is open for business?

Often, with planning. Cabling upgrades can often be completed in phases, though some work may require after-hours scheduling. Coordinate installation times around tenant business activities and confirm with the contractor which tasks can happen during business hours.

Does installing new cabling mean the tenant's network will go down?

Not always. Installing new cabling does not always require disconnecting existing services. Identify the active connections that must remain operational, and ask the contractor whether any services will be interrupted and when.

Who is responsible for testing and restoring service after cabling work?

Settle it before work starts. Coordinate testing, any planned service interruptions and restoration responsibilities among the contractor, the property manager, the tenant and the tenant's IT personnel.