Before You Sign Off on a Tenant Improvement: Check the Low-Voltage Infrastructure

A completed commercial renovation should include a review of the communications infrastructure against the approved project scope. Five things property managers should check before final acceptance: outlet locations, the telecom room, cable identification, testing results and the final handoff.

A+ Cable Runners, Commercial Property Management Educational Series: Before You Sign Off on a Tenant Improvement: Check the Low-Voltage Infrastructure. Five things property managers should check: outlet locations, telecom room, cable identification, testing results, and final handoff. Verify the infrastructure before accepting the finished space.

This is the fifteenth post in our Commercial Property Management educational series.

A completed commercial renovation should include a review of the communications infrastructure against the approved project scope. Identifying missing or incomplete work before final acceptance can help prevent occupancy delays. Here are five things property managers should check.

1. Outlet locations

Confirm installed network outlets match the approved floor plan.

Walk the space with the floor plan in hand. Furniture layouts change during a build-out, and an outlet that ends up behind a cabinet or on the wrong wall is much easier to fix before the tenant moves in.

2. Telecom room

Inspect equipment racks, cable management and accessibility.

The eleventh post in this series, on what to look for in an overcrowded telecom closet, covers what to check in the room.

3. Cable identification

Verify required labels and connection records are complete.

Each outlet should be traceable to its patch panel port. TIA-606, the industry standard for administering cabling, covers assigning identifiers to cables, pathways and spaces and keeping a record for each one. Check that the labels on the outlets match the labels on the patch panel and the records you were given.

4. Testing results

Confirm the specified testing has been completed and documented as required.

Basic cable testing and performance certification are different services. Verification shows a cable is connected correctly; certification measures it against the performance standard for its category, and cabling manufacturers generally require certification results before they will issue a system warranty. Compare the test results with what the project specified. Our post on cable testing versus certification explains what a PASS does and does not tell you.

5. Final handoff

Verify agreed responsibilities, documentation and outstanding work.

A handoff package may include as-built drawings, test results, label records and a list of outstanding items. Agree on what is due at the start of the project, so the list at the end is a check rather than a negotiation. Our post on what to ask before approving a cabling estimate covers getting testing, labeling and documentation into the scope.

Here's what many people don't realize

  • A finished office does not necessarily mean its network infrastructure is ready.
  • Basic cable testing and performance certification are different services.
  • Installing cabling and activating network equipment are separate responsibilities.

Questions to ask your contractor

  • Were all specified connections installed?
  • Are outlets and patch panels labeled?
  • What testing was completed?
  • Is the required documentation available?
  • Are any low-voltage items outstanding?

Our free Property Manager Low-Voltage Inspection and Tenant Turnover Checklist includes questions on tenant improvements and labeling you can use on a final walkthrough.

The bottom line

Verify the infrastructure before accepting the finished space.

The Commercial Property Management series began with what to check before converting office space for a new tenant. That post covers what to look at before the work starts; this one covers what to look at before you accept it. To see the cabling work we do, visit our computer network cabling page.

Educational information only. Cabling requirements and performance depend on the installation, equipment, applicable standards and intended application. This is not a substitute for project-specific design or engineering. Always follow applicable codes and manufacturer instructions, and verify project requirements individually.

Common questions

What low-voltage items should be checked before accepting a tenant improvement?

Five things: installed network outlets against the approved floor plan, the telecom room's equipment racks, cable management and accessibility, the required labels and connection records, the specified testing and its documentation, and the agreed responsibilities, documentation and outstanding work at handoff.

If the office looks finished, is the network ready?

Not necessarily. A finished office does not necessarily mean its network infrastructure is ready. Installing cabling and activating network equipment are separate responsibilities, so confirm who is doing each.

Is a basic cable test the same as certification?

No. Basic cable testing and performance certification are different services. A basic verification test shows the cable is connected correctly; certification measures it against the performance standard for its category. Check which level of testing the project specified.