What to Check Before Converting Office Space for a New Tenant

A commercial space may look ready for its next tenant, but what about the cabling above the ceilings and behind the walls? Five things to check before renovations begin: cabling, outlets, the telecom room, pathways, and Wi-Fi, cameras and access control.

This is the first post in our five-part Commercial Property Management educational series.

A commercial space may look ready for its next tenant, but what about the network cabling and communications infrastructure hidden above the ceilings and behind the walls? Before renovations begin, property managers and business tenants should evaluate whether the existing low-voltage infrastructure can support the new tenant's needs. Here are five things to check.

1. Existing network cabling

Determine whether the existing Cat5e, Cat6 or fiber cabling is in good condition, properly terminated and capable of supporting the new tenant's requirements.

Older cabling does not automatically need replacement. Testing tells you more than the cable's age does, and it helps to know what kind of test you are getting: a basic wire-map check shows the cable is connected correctly, not that it meets the performance of its category. Our post on cable testing versus certification explains the difference.

The previous tenant may also have left cable behind that no longer connects to anything. The National Electrical Code treats cable that isn't terminated at equipment and isn't tagged for future use as abandoned cable, and generally calls for the accessible portion to be removed. A conversion is a good time to sort out what stays, what gets tagged for reuse and what comes out.

2. Network outlet locations

Will the new office layout require additional network outlets? Moving walls, desks, conference rooms or reception areas can leave existing outlets in the wrong locations. Compare the outlets you have with the proposed floor plan before the walls go up, not after.

3. Telecom room capacity

Check whether the existing telecom room has sufficient space, rack capacity, power and appropriate environmental conditions for the new tenant's equipment. The industry standard for telecommunications pathways and spaces, TIA-569, addresses room size, temperature and humidity, and clearance for service. A closet that served a small tenant may not have room, power or cooling for a larger one. Our post on what a messy network closet is really costing you covers what a cleanup involves if the room needs one.

4. Cable pathways and accessibility

Before installing new cables, evaluate existing conduits, cable trays, J-hooks and accessible ceiling pathways. Changes to walls and ceilings can affect existing cable routes and future accessibility.

The electrical code expects cable above a suspended ceiling to be supported by the building structure, not by the ceiling grid or its support wires, and expects that a buildup of cable not block the removal of ceiling panels to reach equipment. Our posts on why ceiling tiles are not cable supports and the types of cable supports go into more detail.

5. Wi-Fi, security cameras and access control

Will the new tenant need additional wireless access points, security cameras or controlled doors? These systems may require additional cabling, pathways and equipment locations. Planning them alongside the rest of the conversion is easier than adding them after the ceilings close. Our post on Wi-Fi dead zones shows how access point locations come back to cabling.

Here's what many people don't realize

  • A space that worked perfectly for the previous tenant may not meet the next tenant's technology requirements.
  • Discovering these problems after walls are finished, ceilings are closed or furniture is installed can increase installation costs and cause unnecessary delays.

Questions to ask before renovations begin

  • Can existing network cabling be reused?
  • Will the proposed floor plan require additional network outlets?
  • Are existing cable pathways accessible and adequate?
  • Does the telecom room support the new tenant's equipment?
  • Have future Wi-Fi, camera and access control needs been considered?

Our free Commercial Tenant Low-Voltage Readiness Checklist puts thirty questions like these in one place, covering outlets, cabling, the telecom room, Wi-Fi and camera wiring, and what the lease makes the tenant's responsibility. Tenants signing a lease may also find our post on the network questions to ask before signing a new office lease useful.

The bottom line

The best time to evaluate a building's low-voltage infrastructure is before renovation work begins, not after the new tenant moves in. A little planning can help prevent unnecessary expenses, construction delays and disruptions to the new tenant's business.

The next post in the series looks at why cable pathways matter in commercial buildings. To see the low-voltage work we do, visit our low-voltage services page.

Educational information only. Cabling requirements and performance depend on the installation, equipment, applicable standards and intended application. This is not a substitute for project-specific design or engineering. Always follow applicable codes, and verify project requirements individually.

Common questions

Does old network cabling have to be replaced when a new tenant moves in?

Not automatically. Determine whether the existing Cat5e, Cat6 or fiber cabling is in good condition, properly terminated and capable of supporting the new tenant's requirements. Testing helps answer that before anyone decides to replace it.

When should a property manager evaluate the low-voltage infrastructure?

Before renovation work begins, not after the new tenant moves in. Problems discovered after walls are finished, ceilings are closed or furniture is installed can increase installation costs and cause unnecessary delays.

What should be checked in the telecom room for a new tenant?

Whether it has sufficient space, rack capacity, power and appropriate environmental conditions for the new tenant's equipment.