This is the tenth post in our Commercial Property Management educational series.
Tenant improvements often involve the property manager, tenant, general contractor, internet provider and IT team. Clarifying responsibilities before installation helps avoid delays, duplicate work and missed connections. Here are five things property managers should check.
1. Scope of work
- Confirm which network, camera, Wi-Fi and access-control connections are included in the build-out.
The questions in our earlier post on what to ask before approving a cabling estimate help pin down what a low-voltage scope includes.
2. Building access
- Coordinate telecom-room access, ceiling work, approved pathways and building requirements.
3. Service provider
- Identify the internet service handoff location and coordinate provider installation dates.
The provider's responsibility ends at the demarcation point, where its facilities meet the premises wiring. Under the FCC's rules for telephone wiring, in a multi-tenant building that point may be at the minimum point of entry, the closest practicable point to where the wiring crosses the property line or enters the building. Cabling from there to the tenant's suite is premises wiring, so someone has to be assigned to it.
4. IT responsibilities
- Clarify who supplies and configures switches, Wi-Fi equipment and other network devices.
5. Testing and handoff
- Confirm cable testing, labeling, documentation and the final handoff to the tenant's IT team.
Testing can mean a basic check that each cable is connected correctly or full certification against the performance standard for its category. Our post on cable testing versus certification explains the difference, so the build-out scope can say which one is included.
Here's what many people don't realize
- A finished space may still lack active network service.
- Installed cabling and configured equipment are separate tasks.
- Unclear responsibilities can delay tenant occupancy.
Questions to ask your contractor
- Who supplies the network equipment?
- Who coordinates internet service activation?
- Who approves cable routes and access?
- Who configures the network devices?
- What testing and documentation are included?
The bottom line
Define responsibilities before work begins. Clear coordination helps reduce rework, delays and unexpected costs.
The next posts in the series continue with what to look for in an overcrowded telecom closet. The earlier posts in this part of the series covered preparing a space for a new IT provider, upgrades in older buildings, adding cameras and access points and tenant move-outs. To see the cabling work we do, visit our computer network cabling page.
Educational information only. Cabling requirements and performance depend on the installation, equipment, applicable standards and intended application. This is not a substitute for project-specific design or engineering. Always follow applicable codes and manufacturer instructions, and verify project requirements individually.